OSM PoC 3 - Heimdall Hybrid Web: Difference between revisions

From OSM Public Wiki
Jump to: navigation, search
Line 18: Line 18:
= PoC Proposal =
= PoC Proposal =
* [[media:OSM_POC_3_Overview.pdf | Initial Proposal: OSM PoC#3 Overview]]
* [[media:OSM_POC_3_Overview.pdf | Initial Proposal: OSM PoC#3 Overview]]
= PoC Report =
Coming soon!


= OSM Components =
= OSM Components =

Revision as of 11:09, 8 November 2018

PoC Team Members

Instituto de Telecomunicações/Universidade de Aveiro, Universidade Federal do Rio Grande do Sul, Wavecom

Instituto de Telecomunicações is an OSM participant

  • Instituto de Telecomunicações / Universidade de Aveiro: Eduardo Sousa eduardosousa@av.it.pt
  • Universidade Federal do Rio Grande do Sul
  • Wavecom

Abstract

5G envisions the rise of different verticals spanning a wide area from Automotive to eHealth. For these verticals to be successful, their instantiation must be easy and reproducible. Configuration should be automatic and error-free. Day 2 operations should also be managed using MANO (e.g. OSM), so there is no need to manually setup configurations for new users/clients. This PoC demonstrates a use case for an enterprise communications vertical, which can be fully orchestrated and managed by OSM.

Key Takeaways

  • Demonstrate a 5G vertical scenario being orchestrated and managed by OSM
  • Usage of Day 0/1/2 configuration to make the initial configuration and add clients to the vertical
  • Dynamically configure different service chains to provide differentiated services to specific clients

PoC Proposal

OSM Components

  • OSM Rel FOUR

Demos

Coming soon!