SuccessChanges

Summary

  1. Update MON and LCM Dockerfile to install ca-certificates in the (details)
  2. Pin version of LXD to latest LTS, and pin juju 2.8.11 (details)
  3. Add NTP Sync (details)
Commit 77e764e28f59f40195c18009eb86ec46f37a4235 by garciadeblas
Update MON and LCM Dockerfile to install ca-certificates in the
appropriate docker layer
Change-Id: I5b60040f9b0afbde05309ea93aeb92d879d24591 Signed-off-by:
garciadeblas <gerardo.garciadeblas@telefonica.com>
The file was modifieddocker/MON/Dockerfile
The file was modifieddocker/LCM/Dockerfile
Commit aac52e0ac6d5364e48d2c25b00d6a1435b7e0d6a by david.garcia
Pin version of LXD to latest LTS, and pin juju 2.8.11
Change-Id: I31f5540e0d8991006e8b3767a94fe4126945cafb Signed-off-by:
David Garcia <david.garcia@canonical.com>
The file was modifiedinstallers/charmed_install.sh
The file was modifiedinstallers/full_install_osm.sh
Commit 4050c22b0deabfed09b2544f7a23bb24a97417c8 by beierlm
Add NTP Sync
Adds ntp to the new VM and forces a full clock sync to avoid any drift
between Jenkins and ETSI VIM
Fixes bug 1776
Change-Id: I7cec55cdedcf53f6206ee54959dea4f8f1cfeb65 Signed-off-by:
beierlm <mark.beierl@canonical.com>
(cherry picked from commit b59bd0dbeec7956585b656606ae03f8f294c5d45)
The file was modifiedjenkins/ci-pipelines/ci_stage_3.groovy