@@ -151,7 +151,7 @@ The VNF Day-1 configuration may require some parameters passed at instantiation
...
@@ -151,7 +151,7 @@ The VNF Day-1 configuration may require some parameters passed at instantiation
## Day-2 requirements
## Day-2 requirements
The main objetive of Day-2 is to be able to **re-configure** the VNF so its behavior can be modified during runtime, as well as being able to monitor its main KPIs and run scaling actions over it.
The main objetives of Day-2 are to be able to **re-configure** the VNF so its behavior can be modified during runtime, being able to monitor its main KPIs, and running scaling or other closed-loop operations over it.