--- /dev/null
+# Instantiation in VIMs with more than one physnet
+
+## Proposer
+
+- Gerardo Garcia (Telefonica)
+- Alfonso Tierno (Telefonica)
+- Francisco Javier Ramon (Telefonica)
+
+## Type
+
+**Feature**
+
+## Target MDG/TF
+
+RO, CLI (optional)
+
+## Description
+
+In environments where some physical redundancy is required in terms of
+networking, it is common the use of schemas with more than one switch upstream,
+dividing the physical medium in groups of physical interfaces depending of the
+upstream switch they are attached. In order to facilitate a sensible management
+of these physical interfaces belonging to different "redundancy groups" by the
+VIM, there is the possibility to classify them into the so-called 'physnets',
+so that the VIM can leverage on that physical redundacy if needed.
+
+While this feature should not create a fundamental change in OSM operation or
+the way its modelling works, and it is a fact that OSM can work with these
+environments, it is also true that it works today with some limitations when
+SDN Assist is in place. Thus, in a VIM with multiple physnets, only one can be
+registered today when configuring a VIM target in OSM, leading to potential
+underuse of resources (usually, by one half). Furthermore, when those physnets
+obbey to some kind of physical active-active scheme, OSM cannot leverage on
+this information to make NS/NSI deployments more reliable.
+
+This feature intends to solve the limitations described above.
+
+## Demo or definition of done
+
+With a VIM with multiple physnets, check that it is possible:
+
+- Register the VIM with all its physnets when defining a VIM target in OSM with
+SDN Assist.
+- Deploy a large NS requiring SDN Assist in such a VIM so that no interfaces
+are excluded because of the physnet they belong.